SIA OpenIR  > 数字工厂研究室
Improved heuristic algorithm for modern industrial production scheduling
Jiang, Yongqing1; Pan FC(潘福成)2
Department数字工厂研究室
Source PublicationInternational Journal of Modelling, Identification and Control
ISSN1746-6172
2018
Volume30Issue:4Pages:284-292
Indexed ByEI
EI Accession number20184406029475
Contribution Rank2
Funding OrganizationLiaoning Province Science and Technology Project (2015106015)
Keywordproduction management modern industrial heuristic scheduling
AbstractScheduling is one of the core links of modern industrial production. Scheduling needs to be designed according to the characteristics of the production line. In order to optimise the problem of workshop scheduling, the service-oriented programming idea and advanced technology to optimise the system development of mixed flow shop are adopted. The system is designed for applications in a distributed network environment. In this paper, an improved heuristic industrial production scheduling method is proposed to solve the scheduling system problem with multiple scheduling tasks, multiple processes, multiple stations, multiple constraints and rules. This method specifies the processing equipment, start time and completion time for each process of the production task. The application method shows that the proposed method can improve the automation and intelligence level of the scheduling process, improve the utilisation rate of equipment and other production resources, and give full play to the enterprise production capacity.
Language英语
Document Type期刊论文
Identifierhttp://ir.sia.cn/handle/173321/24574
Collection数字工厂研究室
Corresponding AuthorJiang, Yongqing
Affiliation1.College of Mechanical Engineering, Chongqing University, Chongqing 100049, China
2.Shenyang Institute of Automation, Chinese Academy of Sciences Shenyang, Nanta Street 114, Shenyang 110016, China
Recommended Citation
GB/T 7714
Jiang, Yongqing,Pan FC. Improved heuristic algorithm for modern industrial production scheduling[J]. International Journal of Modelling, Identification and Control,2018,30(4):284-292.
APA Jiang, Yongqing,&Pan FC.(2018).Improved heuristic algorithm for modern industrial production scheduling.International Journal of Modelling, Identification and Control,30(4),284-292.
MLA Jiang, Yongqing,et al."Improved heuristic algorithm for modern industrial production scheduling".International Journal of Modelling, Identification and Control 30.4(2018):284-292.
Files in This Item:
File Name/Size DocType Version Access License
Improved heuristic a(845KB)期刊论文作者接受稿开放获取CC BY-NC-SAView Application Full Text
Related Services
Recommend this item
Bookmark
Usage statistics
Export to Endnote
Google Scholar
Similar articles in Google Scholar
[Jiang, Yongqing]'s Articles
[Pan FC(潘福成)]'s Articles
Baidu academic
Similar articles in Baidu academic
[Jiang, Yongqing]'s Articles
[Pan FC(潘福成)]'s Articles
Bing Scholar
Similar articles in Bing Scholar
[Jiang, Yongqing]'s Articles
[Pan FC(潘福成)]'s Articles
Terms of Use
No data!
Social Bookmark/Share
File name: Improved heuristic algorithm for modern industrial production scheduling.pdf
Format: Adobe PDF
All comments (0)
No comment.
 

Items in the repository are protected by copyright, with all rights reserved, unless otherwise indicated.